MIS Test Integration
EN RU
Projects
Портфолио

Projects

Project 1 - Slide 1 Project 1 - Slide 2 Project 1 - Slide 3 Project 1 - Slide 4
Oil & Gas Turnaround Maintenance

SD Project

Location Kazakhstan
Year 2024

Client: NCOC Bolashak Plant

As part of the SD 2024 Project, a team of 96 specialists from Sashma-MIS successfully completed key turnaround activities.

The work was carried out with high efficiency, full compliance with standards, and on-time completion of all stages.

Project 2 - Slide 1
Fabrication Installation

Wellhead Control Platform

Location Kazakhstan
Year 2023

Client: NCOC

WCP Fabrication and Offshore Installation for NCOC – Kashagan Field Executed by KCOI and MSS.

Исполнители: KCOI и MSS.

Coatings: Intershield 300, Chartek 7, Interthane 990.

Project 3
Fire Protection

KARACHAGANAK PROCESSING COMPLEX (KPC)

Location Kazakhstan
Year 2023

Client: KPO

Maintenance scope where client decided to switch from Cementitious to Intumescent Epoxy Fire Protection.

Coatings: Intergard 251, Chartek1709.

Project 4 - Slide 1
Water Treatment

Reverse Osmosis

Location Kazakhstan
Year 2023

Client: KPO

Envirotech has successfully supplied and commissioned a containerized High Brackish Reverse Osmosis Desalination Plant.

Capacity of 500 m3/day to compensate the shortage of fresh water.

Project 5
EPC

Future Growth Project

Location Kazakhstan
Year 2016-2019

Client: TCO (Chevron)

Successful Completion of the $45 Billion Future Growth Project (FGP-WPMP) for Tengizchevroil (TCO).

Project 3
Coatings

KSU Project

Location Kazakhstan
Year 2025

Client: PSI Group

Supplying of International Paint for Electrical Substations for TCO

Coatings: Interzinc52, Intergard 475HS, Interthane990.

Project 4 - Slide 1 Project 4 - Slide 2 Project 4 - Slide 3 Project 4 - Slide 4 Project 4 - Slide 5
Water Treatment

PAC Coagulant Chemical Dosing Skid

Location Kazakhstan
Year 2023

Client:NCOC

As part of the project, the PAC Coagulant Chemical Dosing Skid was developed and implemented for precise injection of coagulant chemicals into wastewater. The system is configured to deliver up to 17.1 L/h at 4 bar pressure, ensuring efficient removal of suspended solids and improved water quality. The solution was integrated at the client’s facility and tailored to meet the needs of large industrial operations, including the oil and gas, mining, food and beverage, agriculture, and construction sectors.

Project 5
EPC

Steel Structures for Fujairah

Location UAE
Year 2024

Client:Kelly Steel Engineering

Steel Structures for Fujairah open stadium

Project 3 Project 3
Coatings

Coat System and specialized internal coating

Location UAE
Year 2024

Client:Magnum Technologies

Our 3 Coat System and specialized internal coating

Was used for:- Airproduct E house - Emerson E House - Haliburton tanks

Project 4 - Slide 1
Water Treatment

Topcoat for Repainting of Mining Heavy Machineries

Location UAE
Year 2024

Client:Soutwest Middle East

Our Topcoat was used for Repainting of Mining Heavy Machineries

Project 5 Project 5
EPC

Coat for Halliburton stock tanks and trailers

Location UAE
Year 2024

Client:Al Shirawi

3 Coat system was used for Halliburton stock tanks and trailers.

About Us
Футтер