Projects
Client: NCOC Bolashak Plant
As part of the SD 2024 Project, a team of 96 specialists from Sashma-MIS successfully completed key turnaround activities.
The work was carried out with high efficiency, full compliance with standards, and on-time completion of all stages.
Client: NCOC
WCP Fabrication and Offshore Installation for NCOC – Kashagan Field Executed by KCOI and MSS.
Исполнители: KCOI и MSS.
Coatings: Intershield 300, Chartek 7, Interthane 990.
Client: KPO
Maintenance scope where client decided to switch from Cementitious to Intumescent Epoxy Fire Protection.
Coatings: Intergard 251, Chartek1709.
Client: KPO
Envirotech has successfully supplied and commissioned a containerized High Brackish Reverse Osmosis Desalination Plant.
Capacity of 500 m3/day to compensate the shortage of fresh water.
Client: TCO (Chevron)
Successful Completion of the $45 Billion Future Growth Project (FGP-WPMP) for Tengizchevroil (TCO).
Client: PSI Group
Supplying of International Paint for Electrical Substations for TCO
Coatings: Interzinc52, Intergard 475HS, Interthane990.
Client:NCOC
As part of the project, the PAC Coagulant Chemical Dosing Skid was developed and implemented for precise injection of coagulant chemicals into wastewater. The system is configured to deliver up to 17.1 L/h at 4 bar pressure, ensuring efficient removal of suspended solids and improved water quality. The solution was integrated at the client’s facility and tailored to meet the needs of large industrial operations, including the oil and gas, mining, food and beverage, agriculture, and construction sectors.
Client:Kelly Steel Engineering
Steel Structures for Fujairah open stadium
Client:Magnum Technologies
Our 3 Coat System and specialized internal coating
Was used for:- Airproduct E house - Emerson E House - Haliburton tanks
Client:Soutwest Middle East
Our Topcoat was used for Repainting of Mining Heavy Machineries
Client:Al Shirawi
3 Coat system was used for Halliburton stock tanks and trailers.